LABLE

Notification's

SUBMIT BTECH PROJECT REGISTRATION FORMS TO HOD ON 28th JAN2020 AT 11AM AND PAY SPARDHA FEE




DOWNLOAD II SEM SYLLABUS and PROJECT REGISTRATION FORM

27 March 2018



    B.Tech 2-2 Semester Regular/Supplementary Examinations Time Table - April/May 2018


                                                                 R16 (Regular)   Download ⤋

                                          R15 (Supplementary)     Download ⤋

                                                              R13 (Supplementary)    Download ⤋




       B.Tech 3-2 Semester Regular/Supplementary Examinations Time Table - April/May 2018


                                                                       R15 (Regular)  Download ⤋

                                                                 R13 (Supplementary)  Download ⤋


B.Tech 4-2 Semester Regular/Supplementary Examinations Time Table - April/May 2018


                                                                    R13 (Regular/Supplementary)  Download ⤋

24 March 2018




DEPARTMENT OF CIVIL ENGINEERING

B.TECH IV-II SEM MARCH-2018


COMPREHENSIVE VIVA TOPICS:



S.NO
SUBJECT
TOPICS
CONCERN FACALTY NAME
SIGN
1

DSS
Fillet welded connection, Tension members, and working stress method, Shear log, limiting state method, column’s &structs, Beams, Bolted connections

NAGALAXMI.T


2

FE
Retaining walls, Safe bearing capacity of different types of foundation, Shallow & Deep, Tests on soil, soil exploration

SUNDER.P


3



TE
Components of highway alignment, Sight distance & Super elevation, Geometric design of a Pavement, Highway Materials, Types of roads, Road construction at Dams & Bridges, Site selection procedures.
Components of Foundation in Railway tracks, Degree of curve, Intelligent transport systems





K. VamshiMadhukar



4


Surveying
What is Surveying & it’s Principle.
Classification based on instruments & Principles of
Chain, Compass, Leveling, Plane Table, Theodolite, Tachometry,
Total Station, Curves, lab equipment’s & Procedures, Demonstration.



AJAY.V




5


WRE
Types of reservoirs, factors affecting the selection of dam site, reservoir sedimentation, reservoir storage, stability analysis of a gravity dam, spillway types, hydraulic jump, diversion head works, Bligh &Khosla theory, canal regulation and head regulators, exit gradient


R.LAXMAN


6

E.E
Methods of sewage collection & disposal, design of sewers, shape and materials, sources of water, population forecasting, sewage, sullage, refuse, garbage


D.SHIVA







7


C.T
Ingredients of concrete, Properties, Tests, Types, advantages, Disadvantages of (cement, aggregates, Admixtures)
Fresh Concrete, Mix Design, standard specifications,



KAVITHA.G



8


BMCP


Explain about the building stones, classification &quarrying
Properties , what are the types & properties of wood , ingredients of cement & chemical composition of cement field & lab tests types of roofs ,what is the damp proof course requirements systems of ventilations , types of bonds difference b/w stones & brick masonry , what is pointing , what is formwork classification of buildings



KAVITHA



9


DRCS
Concept of RC design-explain limit state method. What is the stress block parameters design of & difference b/w singly & doubly reinforced beam. What is working stress method, concept of bond ,anchorage & development length, limit state, design for serviceability for deflection, cracking, design process of one way & two way slab & continuous slab, explain about loads acting on axial, uniaxial & biaxial, design of footing types of footing.


NAGALAXMI



10.


PCS
General principles of pre-stressing, pre-tensioning & post-tensioning advantages & disadvantages of pre-stressed concrete, types of PSC, explain methods of PSC like Hoyer system, Magnel, Blaton like, losses of pre-stress, shrinkage of concrete, creep of concrete, relaxation of stresses in steel, analysis of sections for flexure beam, transmission of pre-stressing force by bond, analysis by Guyon, Magnel, Rowes method. Types of propped & un propped stress distribution, importance of control of deflections.


HIMABINDHU


22 March 2018

 Reference


S.NO
TITLE OF THE PPT
1
Railway Track 
2
 Water Pollution
3
 Porous Asphalt  Roads
4
 Rapid Mass Building Construction By Using Gfrg
5
 Underwater Windmill
6
 Pervious Concrete
7
 Intelligent Transport System
8
 Rainwater Harvesting
9
 Light Weight Concrete Bricks
10
 Geo textiles
11
 Transparent Concrete
12
 Prefabricated Structure
13
Robo sand
14
 Shotcrete
15
 Control Of Corrosion On Under Water Piles
16
 Light Weight Concrete
17
 Sky Bus Technology
18
 Domes
19
 Mivan Technology
20
Soil Cement 
21
 Tunnel Engineering
22
 Ground Improvement Techniques
23
 Canal Intersection
24
 Use Of Rubber Tyres In Bituminous Roads
25
 Blast Resistant Building Building
26
 Under Water Turbines
27
 Stability Of High Rise Buildings
28
 Plastic Roads
29
 Underwater Tunnelling9submerged)
30
 Rainfall Runoff Modeling In The Ungauged Catchment
31
 Noise Control Of Building
32
 Straw - Bale Construction
33
 Fiber Reinforced Concrete
34
 Sprinkler Irrigation
35
 Self Compacting Concrete
36
 Underwater Windmill
37
 Solar Roads
38
 Advanced Construction Materials
39
 Papercrete
40
 Automated Transportation System,
41
 Bubble Deck Slab
42
 Solar Building
43
 Trenchless Technology
44
 Green Concrete
45
Drip Irrigation
46
 Bacterial Concrete
47
 Equipments Used For Road Construction
48
 Design Of Canal
49
 Electro Osmosis Method
50
 Demolition Of Buildings
51
 Special Concrete
52
 Reactive Powder Of Concrete
53
 Bamboo As A Building Material
54
 High Performance Concrete
55
 Highway Network System
56
 Disaster Management


NOTE :ABOVE  TOPICS ORE ONLY REFERENCE.FOR A IDEA